Contacts

Managing Authority
67, William Gladstone Str.
1000 Sofia
Fax: +359 2 988 4820

ope@moew.government.bg
banner_1 banner_1
Archive

Jun 21, 2011

MINIMUM REQUIREMENTS TO WATER SECTOR CONSTRUCTION PROJECTS PUBLISHED

Operational Programme Environment published Annex No. 1 to the Instructions on holding preliminary consultations under procedure BG161PO005/10/1.11/02/16 “Improvement and Development of Water and Wastewater Infrastructure for Agglomerations with over 10 000 PE” which sets out the minimum requirements to project documents. Applicants must conform with these requirements when preparing the projects for review and opinion by the Managing Authority of the Programme. If one or several of the requirements is not met, the documents submitted will not be subject to detailed review and will be sent back to the applicant for major redrafting.

Archive