Contacts

Managing Authority
67, William Gladstone Str.
1000 Sofia
Fax: +359 2 988 4820

ope@moew.government.bg
banner_1 banner_1

Search in projects

Priority axis 1: Water

Integrated project for management and treatment of water in the town of Lom

Category: Priority axis 1: Water

Amount: 927,120.00lv


Register number: 58131-114-114

Beneficiary type: Municipality

Beneficiary name: Lom

Project year: 2011

District: Lom

Region: Montana


Goal

With the present project proposal Lom Municipality applies for obtaining of technical assistance from the Operational Programme “Environment”, on the procedure BG161PO005/1.30/01/01, for preparation and working out of investment projects for improvement and development of the infrastructure for waste water in the town of Lom, Lom Municipality


Acts

  • Preparation of applications procedure BG161RO005/08/1.30/01/01;
  • Mobilization;
  • Coordination and supervision during the project implementation;
  • Preparation of the tender documents for procurement of the activities, carried out by external consultants;
  • Pre-invstment feasibility studies and preparation of an application for funding of investment projects under the OP “Environment” under Priority axis 1;
  • Working out of technical investment projects for construction of technical infrastructure to “Integrated management and water treatment in the town of Lom;
  • Preparing of 3 DDP (Detailed Development Plans);
  • Preparation of environmental assessments, EIA and the Ordinance for assessing the compatibility of PP and P for Natura 2000 and application for a permit for discharging waste water, issued by the Basin Directorate;
  • Execution of the contract for audit of the project;
  • Legal counseling;
  • Conducting of an information campaign during the technical assistance;
  • Conformity assessment of the investment projects with the legal requirements – 4 copies.


« обратно