Contacts

Managing Authority
67, William Gladstone Str.
1000 Sofia
Fax: +359 2 988 4820

ope@moew.government.bg
banner_1 banner_1

Search in projects

Priority axis 1: Water

Preparation for reconstruction and completion the construction of the water supply and sewerage networks of the town of Simitly and construction of treatment plants for drinking water and waste water

Category: Priority axis 1: Water

Amount: 2,268,960.00lv


Register number: 58131-169-169

Beneficiary type: Municipality

Beneficiary name: Simitli

Project year: 2011

District: Simitli

Region: Blagoevgrad


Goal

Preparation for the reconstruction of the existing water supply and sewerage system in the town of Simitli and the completion of its construction, as well as construction of treatment plants for drinking and waste water. The preparation includes mainly the following activities - a pre-investment feasibility study, making of analysis of the costs and benefits, design, preparation of tender documentation for the infrastructure projects.


Acts

§ Pre-investment feasibility study for reconstruction of the sewerage network of the town of Simitli;

§ Pre-investment feasibility study for reconstruction of the water supply network of the town of Simitli;

§ Actualization of the prepared detailed design for construction of sewerage network (2323m) in Drankalitsa neighborhood in the town of Simitly;

§ Preparation of a detailed design for construction of 4300 m water supply network of the main street arteries in the residential district Oranovo in the town of Simitli;

§ Preparation of detailed design for construction of 4300 m of sewerage network of the main street arteries in the resid. distr. (residential district) Oranovo in the town of Simitli;

§ Preparation of a detailed design for construction of 2000 m of sewerage network of the central street of “Georgi Dimitrov”;

§ Preparation of a detailed design for reconstruction of the internal and external water supply network of the town of Simitly;

§ Preparation of a detailed design for reconstruction of the sewerage network of the town of Simitly;

§ Preparation of a detailed design of Waste water treatment plant for drinking water of the town of Simitly;

§ Preparation of a detailed design for Waste water treatment plants of the town of Simitly;

§ Preparation of financial and economic analysis, analysis of the costs and benefits;

§ Preparing of documents for awarding of public procurement contracts for the activities included in the future infrastructure project;

§ Completion of an application form for the future investment project;

§ Technical assistance for the project management;

§ Audit of the project;

§ Publicity of the Project.


« обратно