Priority axis 1: Water

Technical assistance for detailed development of the infrastructure proposal “Completing the construction of the Water supply and sewerage network and water treatment of the city of Elena

Category: Priority axis 1: Water

Amount: 650,920.00lv


Register number: 58131-175-175

Beneficiary type: Municipality

Beneficiary name: Elena

Project year: 2011

District: Elena

Region: Veliko Tarnovo


Goal

The project proposal is for preparation of an integrated project for integrated treatment of the water of Elena, which includes reconstruction and modernization of the sewerage networks and facilities, replacement of damped water transmission network, construction of Waste water treatment plant and completing of the main sewerage collector.


Acts

  • Design, including the development of technical / detailed design of the reconstruction and modernization of the sewerage network;
  • Design, including the development of technical / detailed design of reconstruction and modernization of the water transmission networks;
  • Design, including the development of a technical / detailed design for the completion of the incoming main sewerage collector;
  • Design, including development of a preliminary design for construction of WWTP for 10 000 p.e. (population equivalent) with selection of construction site and receiver;
  • Preparation and procedures for preparation and issuance of all necessary permits under the EPA, BDA, WA and SPA, including public discussion;
  • Preparation of financial and economic analysis, including cost-benefit analysis, sensitivity analysis;
  • Preparation of documentation for awarding of public procurement contracts for activities included in the current project and in the future infrastructure project;
  • Completing of application form for the future investment project;
  • Audit of the project by a licensed public accountant;
  • Measures for information and publicity - preparation, publication and dissemination of materials;
  • Organization and management of the project;
  • Preparing of a report for the required activities on the preparation of an infrastructure project with the indicative budget of the project;
  • Preparation of a laboratory report on the quantity and composition of the domestic waste water;
  • Structuring of the project and filling-in of the application form and completing of required documents.