Contacts

Managing Authority
67, William Gladstone Str.
1000 Sofia
Fax: +359 2 988 4820

ope@moew.government.bg
banner_1 banner_1

Search in projects

Priority axis 1: Water

Construction and reconstruction of the internal Water supply and sewerage network of the town of Luky, incoming inlet collector and construction of a joint WWTP

Category: Priority axis 1: Water

Amount: 355,920.00lv


Register number: 58131-08-08

Beneficiary type: Municipality

Beneficiary name: Luky

Project year: 2011

District: Laki

Region: Plovdiv


Goal

Providing of technical assistance to Luky Municipality for preparation of feasibility studies for the whole project, preparation of a preliminary design for construction of WWTP and development of detailed designs for construction and reconstruction of the internal Water supply and sewerage network of the town of Luky. All this is necessary for applying under Priority axis 1 of the Operational Programme “Environment 2007 – 2013” for infrastructure project in the water sector.


Acts

  • Feasibility studies for the WWTP;
  • Preliminary design of the WWTP;
  • Preparation of detailed designs for reconstruction of internal water supply network;
  • Procedures for coordination and approval of the detailed designs;
  • Financial and economic analysis;
  • Preparation of tender documentation for selection of contractors;
  • Completing of application form for applying;
  • Audit of the project;
  • Measures for information and publicity.


« обратно