Contacts

Managing Authority
67, William Gladstone Str.
1000 Sofia
Fax: +359 2 988 4820

ope@moew.government.bg
banner_1 banner_1

Search in projects

Priority axis 1: Water

Technical assistance for the integrated project: Incoming collectors to the WWTP – the town of Rudozem - in two directions - along the river Danube and the rivers Chepinska and Elhovska and construction of internal sewerage and water supply network o

Category: Priority axis 1: Water

Amount: 2,609,840.00lv


Register number: 58131-44-44

Beneficiary type: Municipality

Beneficiary name: Rudozem

Project year: 2011

District: Rudozem

Region: Smolyan


Goal

In the project it is provided for to be worked out detailed designs for construction of objects for which there are not such designs available and they form a part of an integrated project - Incoming collectors to the WWTP – the town of Rudozem and internal sewerage and water supply networks of the settlements along the rivers Elhovska and Chepinska – both of them feeders of the river Arda.


Acts

  • Initiation of production of a notice, tenders for the preparation of detailed designs with 14 lots. Selection of a contractor. Contract with a contractor to prepare detailed designs of 14 lots;
  • Project Management;

Lot 1 – Working out of a detailed design of incoming collector, the village of Plovdivtsi – the town of Rudozem;

Lot 2 - Working out of a detailed design for internal sewerage and water supply network, the village of Korita-Plovdivtsi;

Lot 3 - Working out of a detailed design for internal sewerage and water supply network, the village Elhovets;

Lot 4 - Working out of a detailed design for internal sewerage and water supply network, the village of Vityna;

Lot 5 - Working out of a detailed design for internal sewerage and water supply network, the village of Barchevo – the village of Voikova laka;

Lot 6 - Working out of a detailed design for internal sewerage and water supply network, res. distr. Byala Reka /residential district/– the town of Rudozem;

Lot 7 - Working out of a detailed design for internal sewerage and water supply network, res. distr. Meykovo – the town of Rudozem;

Lot 8 - Working out of a detailed design for reconstruction of internal sewerage and water supply network, central part – the town of Rudozem 16 17 sites - the town of Rudozem Rudozem;

Lot 9 - Working out of a detailed design for internal sewerage and water supply network, the village of Borye - and taken away to incoming collector, the town of Rudozem;

Lot 10 - Working out of a detailed design for water supply network, the village of Chepintsi;

Lot 11 - Working out of a detailed design for internal sewerage and water supply network, the village of Rybnitsa;

Lot 12 - Working out of a detailed design for internal sewerage and water supply network, the village of Sopota;

Lot 13 - Working out of a detailed design for internal sewerage and water supply network, the village of Gramade and the village of Ogled;

Lot 14 - Working out of a detailed design for internal sewerage and water supply network, Durevska neighborhood;

  • Procedures for coordination of detailed designs;
  • Financial and economic analysis and feasibility studies;
  • Completing of an application form;
  • Preparation of tender documentation of the integrated project for construction;
  • Measures for publicity - articles, leaflets, press conferences and newsletters;
  • Accounting audit.


« обратно