Preparation of detailed design for completing the construction of the urban sewerage of the town of Kula - main collectors and street branches, reconstruction and modernization of the water supply network and developing of a preliminary design for th

Category: Priority axis 1: Water

Amount: 552,600.00lv


Register number: 58131-59-59

Beneficiary type: Municipality

Beneficiary name: Kula

Project year: 2011

District: Kula

Region: Vidin


Goal

The project provides for development of a comprehensive detailed design for reconstruction and modernization of the of the water supply network of the town of Kula, through reconstruction / replacement / of the asbestos-cement pipes of total length of 20 000 m. The project also provides to develop a detailed design for completing the construction of the sewerage network of the town – street channels of total length 11 000 m and main collectors of 4,800 m of and a preliminary design for urban Waste water treatment plant.


Acts

  • Presentation of the project to the citizens of the town of Kula;
  • Preparation of tender documentation for the conducting of public procurement for selection of consultant for performing of feasibility studies and preparation of Performance specification for working out of a detailed design for completing the construction of the sewerage of the town of Kula - main collectors and street branches, reconstruction and modernization of the water supply network and a preliminary design for urban Waste water treatment plant, investigation of the existing situation, preparation of the basic requirements of the Performance specification, preparation of tender documentation for selection of a consultant for working out of a detailed design and a preliminary design, working out of a report on EIA, working out of a report for conformity of the detailed design and the preliminary design;
  • Conducting of a procedure for awarding of a public procurement contract for selection of a consultant for conducting of feasibility studies and working out of Performance specification for working out of a detailed design for completing the construction of the sewerage of the town of Kula - main collectors and street branches, reconstruction and modernization of the water supply network and a preliminary design for urban Waste water treatment plant, investigation of the existing situation, preparation of the basic requirements of the Performance specification, preparation of tender documentation for selection of a consultant for working out of a detailed design and a preliminary design, working out of a report on EIA, working out of a report for conformity of the detailed design and the preliminary design;
  • Concluding of a contract with a consultant for performing of feasibility studies and working out of Performance specification for working out of a detailed design for completing the construction of the sewerage of the town of Kula - main collectors and street branches, reconstruction and modernization of the water supply network and a preliminary design for urban Waste water treatment plant, investigation of the existing situation, preparation of the basic requirements of the Performance specification, preparation of tender documentation for selection of a consultant for working out of a detailed design and a preliminary design, working out of a report on EIA, working out of a report for conformity of the detailed design and the preliminary design;
  • Execution of the contract for feasibility studies and working out of Performance specification for working out of a detailed design for completing the construction of the sewerage of the town of Kula - main collectors and street branches, reconstruction and modernization of the water supply network and a preliminary design for urban Waste water treatment plant, investigation of the existing situation, preparation of the basic requirements of the Performance specification, preparation of tender documentation for selection of a consultant for working out of a detailed design and a preliminary design, working out of a report on EIA, working out of a report for conformity of the detailed design and the preliminary design;
  • Performing of internal audit of the conducted procedure;
  • Preparation of tender documentation for conducting of public procurement procedure for selection of consultant for working out of a detailed design for completing the construction of the sewerage of the town of Kula - main collectors and street branches, reconstruction and modernization of the water supply network and a preliminary design for urban Waste water treatment plant – adding the documentation prepared by the consultant;
  • Conducting of public procurement procedure for selection of consultant for preparation of detailed design for completing the construction of the sewerage of the town of Kula - main collectors and street branches, reconstruction and modernization of the water supply network and a preliminary design for Urban Waste water treatment plant;
  • Concluding of a contract with the consultant for preparing of detailed design for completing the construction of the sewerage of the town of Kula - main collectors and street branches, reconstruction and modernization of the water supply network and a preliminary design for Urban Waste water treatment plant;
  • Execution of contract for preparation of a detailed design for completing the construction of the sewerage of the town of Kula - main collectors and street branches, reconstruction and modernization of the water supply network and a preliminary design for Urban Waste water treatment plant;
  • Performing of internal audit of the performed procedure;
  • Carrying out a procedure for obtaining of decision for estimating the need for performing of EIA;
  • Conducting of procedure for public discussion of the report for EIA and obtaining of a decision as per the report of RIEW – the town of Montana;
  • Performing of internal audit of the performed procedure;
  • Determination of a site for GPS (Global positioning System) and conducting of procedure for change of the land designation, under the ALCA /Agricultural Land Conservation Act/;
  • Coordination of a detailed design for completing the construction of the sewerage of the town of Kula - main collectors and street branches, reconstruction and modernization of the water supply network and a preliminary design for urban Waste water treatment plant;
  • Consideration and approval of a detailed design for completing the construction of the sewerage of the town of Kula - main collectors and street branches, reconstruction and modernization of the water supply network and a preliminary design for urban Waste water treatment plant;
  • Preparation of tender documentation for selection of consultant for performing of an audit of the project;
  • Carrying out a procedure for selection of a consultant for performing of an audit of the project;
  • Concluding of a contract with the selected consultant for performing of an audit of the project;
  • Performing of an audit of the project by a licensed public - accountant;
  • Issuance of a building permit for “Completing the construction of sewerage of the town of Kula - main branches and street collectors, reconstruction and modernization of the water supply network and a preliminary design for urban Waste water treatment plant.