Priority axis 1: Water

Preparation of an integrated investment project in the Water supply and sewerage sector for the village of Popintsi, Panagyurishte Municipality

Category: Priority axis 1: Water

Amount: 224,800.00lv


Register number: 58131-71-71

Beneficiary type: Municipality

Beneficiary name: Panagyurishte

Project year: 2011

District: Panagyurishte

Region: Pazardzhik


Goal

The strategic aim of the project is: - Improvement of the water status in the village of Popintsi, Panagyurishte Municipality, through the development of environmental infrastructure. The specific aims are: - Improvement of the infrastructure for drinking water and waste water in the village of Popintsi, through the preparation of a quality and complete investment project for applying under Priority Axis 1 of the Operational Programme “Environment 2007 – 2013”. – Development of a preliminary, technical and detailed design for construction of 19 km water supply network and 19 km sewerage network, 900 m inlet collector and Waste water treatment plant for up to 2500 p.e. /population equivalent/ in the village of Popintsi, Panagyurishte Municipality.


Acts

§ Project management;

§ Preparation of the materials for providing of publicity;

§ Press conference for presenting of the project;

§ Preparation and conducting of procedure under the PPA (Public procurement act) for selection of contractor for conducting of a pre-investment feasibility study under Regulation 4;

§ Conducting of a pre-investment feasibility study under Regulation 4;

§ Preparation and conducting of procedure under the PPA (Public procurement act) for selection of contractor for the development of preliminary, technical and detailed design for construction of water supply and sewerage network, inlet collector, Waste water treatment plant;

§ Development of preliminary, technical and detailed design for construction of water supply and sewerage network, inlet collector, Waste water treatment plant;

§ Preparation and conducting of procedure under the PPA (Public procurement act) for selection of contractor for performing of EIA /Environmental impact assessment/;

§ Working out of the EIA;

§ Preparation and issuance of permits under the Water Act;

§ Preparation and conducting of procedure under the PPA (Public procurement act) for selection of contractor for working out of financial and economic analysis (including analysis of the cost effectiveness for the project under 25 million Euros, under the methodical guidance instructions of the Ministry of Finance for preparation and implementation of projects);

§ Performing of financial and economic analysis (including analysis of the cost effectiveness for a project below 25 million Euros, under the methodological guidance of the Ministry of Finance for preparation and implementation of projects);

§ Conference for presenting the project results;

§ Audit of the project