Priority axis 1: Water

Preparation of an integrated investment project in the Water supply and sewerage sector of the town of Panagyurishte, Panagyurishte Municipality

Category: Priority axis 1: Water

Amount: 694,320.00lv


Register number: 58131-72-72

Beneficiary type: Municipality

Beneficiary name: Panagyurishte

Project year: 2011

District: Panagyurishte

Region: Pazardzhik


Goal

The strategic aim of the project is: - Improvement of the water status in the town of Panagyurishte, through the development of environmental infrastructure. The specific aims are: - Improvement of the infrastructure for drinking water and waste water in the town of Panagyurishte, through the preparation of a quality and complete investment project for applying under Priority Axis 1 of the Operational Programme “Environment 2007 – 2013”. – Development of a preliminary, technical and detailed design for construction of 56 km of water supply network and 56 km sewerage network, 900 m inlet collector and Waste water treatment plant for up to 2500 p.e. /population equivalent/ in the town of Panagyurishte.


Acts

§ Technical and financial performance and project management;

§ Preparing of the materials for ensuring publicity;

§ Press conference for the project presentation;

§ Preparing and conducting of procedure under the PPA (Public procurement act) for carrying out of a pre-investment feasibility study under Regulation 4;

§ Carrying out of a pre-investment feasibility study under Regulation 4;

§ Preparing and conducting of procedure under the PPA (Public procurement act) for selection of contractor for the developing of preliminary, technical and detailed design for construction of water supply and sewerage network, inlet collector, Waste water treatment plant;

§ Developing of preliminary, technical and detailed design for construction of water supply and sewerage network, inlet collector, Waste water treatment plant;

§ Preparation and conducting of procedure under the PPA (Public procurement act) for selection of contractor for performing of EIA /Environmental impact assessment/;

§ Working out of the EIA;

§ Preparation and issuance of permits under the Water Act;

§ Preparation and conducting of procedure under the PPA (Public procurement act) for selection of contractor for working out of financial and economic analysis, including analysis of the cost effectiveness for a project under 25 million Euros, under the methodical guidance instructions of the Ministry of Finance for preparation and implementation of projects;

§ Performing of financial and economic analysis (including analysis of the cost effectiveness for a project below 25 million euro, under the methodological guidance of the Ministry of Finance for preparation and implementation of projects);

§ Conference for presenting the project results;

§ Audit of the project.