Contacts

Managing Authority
67, William Gladstone Str.
1000 Sofia
Fax: +359 2 988 4820

ope@moew.government.bg
banner_1 banner_1

Search in projects

Priority axis 1: Water

Complex technical assistance for partial construction of sewerage network with WWTP and rehabilitation of the existing water supply network in the town of Belene

Category: Priority axis 1: Water

Amount: 986,000.00lv


Register number: 58131-74-74

Beneficiary type: Municipality

Beneficiary name: Belene

Project year: 2011

District: Belene

Region: Pleven


Goal

The proposed project by the Municipality of Belene aims to attract technical assistance for preparation of project documentation, necessary for the subsequent implementation of an infrastructure projects within the town of Belene.


Acts

  • Organization and project management, including preparation of documentation for the conducting of procedures under PPA;
  • Selection of project auditor;
  • Feasibility studies for WWTP with selection of site and coordination of procedures under the Environmental Protection Act, the Biodiversity Act and the Water Act;
  • WWTP - geodesic surveying;
  • Geological studies on the site of the WWTP;
  • Development of Zoning and development plan and implementation of procedures for settling the site status of the WWTP and for sewerage and water supply networks;
  • Feasibility studies for selecting the method of design of sewerage network and coordinating procedures under the Environmental Protection Act, the Biodiversity Act and the Water Act;
  • Preparation of financial and economic analyses, including analysis of the revenues and benefits;
  • Development of preliminary schemes for development of the town of Belene on the basis of a new General Master Plan - surveying of the new part;
  • Development of preliminary schemes for development of the town of Belene on the basis of a new General Master Plan sewerage and water supply networks;
  • Design of sewerage and water supply networks - I stage “Geodesic activities”;
  • Design of sewerage and water supply networks - II stage;
  • Detailed design of WWTP, including the entire respective technical infrastructure;
  • Completing of application forms for applying for the Operational Programme ”Environment
  • 2007-2013”;
  • Measures for information and publicity;


« обратно