Priority axis 2: Waste management

Technical assistance for an investment design for integrated management and disposal of the waste generated in Targovishte Municipality and Popovo Municipality

Category: Priority axis 2: Waste management

Amount: 1,079,010.00lv


Register number: 58231-3-307

Beneficiary type: Municipality

Beneficiary name: Targovishte, Popovo

Project year: 2011

District: Targovishte

Region: Targovishte


Goal

The implemented investment design for integrated management and disposal of the waste generated in Targovishte Municipality and Popovo Municipality will introduce a new waste management model that will contribute for reducing total waste to be deposited and for its ecologically sound recovery


Acts

  • Pre-investment studies, including optimization of waste management at regional level, enlargement, reconstruction and modernization of the new regional landfill;
  • Cost-benefit analysis;
  • Conducting of a morphological analysis of generated waste;
  • Geodetic, geological-engineering and hydro-geological surveys for the regional landfill and the reloading station in Popovo Municipality;
  • Development of a conceptual design for the regional landfill and the reloading station in Popovo Municipality;
  • Activities in connection with the procedures for preparation of a detailed structural plan of the future investment proposal;
  • Activities in connection with the Environmental Impact Assessment (EIA) and the Assessment of Compatibility procedures;
  • Activities in connection with the integrated permit issuing procedures;
  • Legal services in connection with permits issuing under the Environment Protection Act, the Biodiversity Act, the Law on the Structure of the Territory (LST);
  • Activities in connection with building permit issuing procedures;
  • Preparing public procurement documents;
  • Integrating the application form under Priority Axis 2 of OP Environment 2007-2013;
  • Information and publicity measures;
  • Project audit.